top of page

Base Camp

Get your van started, get yourself out there​

Screen Shot 2018-12-13 at 4.31.13 PM.png
sprinter-1.jpg

Bare Bones,

action ready 

Complete from $16,760

A great option for adventurers looking to store bikes and other gear in the main cargo area, or for those looking to build their dream van over time, as budget allows.  DIY cabinetry available at DIYcampercabinets.com

 

We finish the interior floor to ceiling with insulation, sound dampening, a variety of flooring choices and LED lighting.

 

Full Interior:

 

First we wrap the interior in insulation and sound dampening.  Next we finish the walls and ceiling in durable fabric panels and install interior LED lighting.  We secure flooring with base layers of wood, sound dampening material and any of your choice of laminate or composite flooring.  We can add the windows you choose to create the ultimate interior experience.  All electrical taps into the vehicle power source.

Features Included

  • Insulation

  • Walls and ceiling

  • LED lighting

  • Floor

  • Electrical : 

           - Solar panels

           - Wiring

           - Inverter charger

Common Options

  • Pop-top with four season insulation

  • Vented side windows

  • Roof rails​

  • Dual capacity battery system

  • Wood upgrade (Pine, Cedar or Beetlekill)

Build Time (approx.) -  4 weeks

Prices subject to change without notice.  Interior projects require a 50% non-refundable deposit in order to be placed on our production schedule.  Projects have a minimum 2-3 month lead time.

*PICTURED : optional cedar upgrade

bottom of page